Severn Trent Water is undertaking the development of a new Wastewater Treatment Plant for the village of Loggerheads in Staffordshire. Upon completion, the Loggerheads site will have a capacity of approximately 3,700 PE (Population Equivalent) and the treated effluent quality will comply with the new phosphorous consent permit.
Loggerheads STW
Project Overview
Early collaborative meetings led to the delivery of the scheme’s two Primary Settlement tanks as a turnkey package. Our 360° Package solution included:
- The design and on-site construction of two conical concrete tank bases incorporating central hoppers.
- ULTRASTORE® Tanks featuring our newly developed Stainless Steel internal Launder systems.
- Due to the site’s hydraulic design, the Primary Settlement Tanks needed to be partially buried below ground, necessitating bespoke designs for both the concrete base and the tank walls.
- Our in-house designed half bridge scraper system.
Project Headlines
- Cost Reduction: Eliminates the traditional “fee on fee on fee” structure.
- Accelerated Programmes: Sequential activities minimize time on site.
- Interface Issue Elimination: Our in-house model ensures all elements are designed and installed by Stortec.
- Sustainability Promotion: Innovative products and approaches combine to provide sustainable solutions.
All elements of the project were delivered using our in-house resources.
Client
Severn Trent Water
End User
Severn Trent Water
Value
- £560,000.00
Scope
Supply & Installation of 2-OFF
Primary Settlement Tanks
Tank
- 2-OFF Primary Settlement Tanks
Diameter
- 8,539mm
Height
- 2,718mm
Volume
- 127m³