Skip to main content

STORTEC is the leading expert in the industry, with a team skilled in water and wastewater engineering. We specialise in total biogas and water engineering solutions from concept and supply chain to completion and support.

STORTEC is the leading expert in the industry, with a team skilled in water and wastewater engineering. We specialise in total biogas and water engineering solutions from concept and supply chain to completion and support.

300

Years Combined Industry Experience

700

Global Projects Delivered

50

Employees

1

Complete Specialist Contractor

About STORTEC

STORTEC operates within the UK and Worldwide Water, Wastewater, Industrial Waste and Renewable Energy Industries.
We are a Specialist Contractor for the design, manufacture and construction of both Liquid and Gas storage solutions. Offering design services, advice, construction right through to the turnkey tailored package.
At our core, the main products offered by STORTEC are the modular bolted Stainless-Steel tanks and BIODOME® Double Membrane Gas Holders. Both products complement our main service, being the Specialist contractor role we implement on construction sites.

Unrivalled in our knowledge and experience within the water and waste industry, we are your specialist contractor, from concept and supply chain to completion and support.
We are proud of our achievements and the resilience the team has demonstrated. In playing our part in changing the industry, we have built a strong, passionate and driven culture for delivering sustainable solutions.

DELIVERING DIFFERENCE TOGETHER – Building big futures for our clients, our team, our planet; sustainably.

OUR STORTEC EXPERIENCE STRETCHES ACROSS THE GLOBE

Our Services

We are leading the industry in the use of stainless steel with its high sustainable credentials, low corrosion, 100% end-of-life recyclable properties and long asset life. Innovation and impact propel us all forward.

Mechanical Installations

Full mechanical installations and construction carried out by our own in-house site crews from start to completion.

Asset Management

We deliver extended asset life solutions for tanks, gas holders and associated equipment with our sustainable and innovative products.

Asset Maintenance

Our rapid response/quick turnaround ensures all our clients are met with a cost-effective solution to ensure their operations continue to run smoothly.

Inspections

Full internal and external inspections of tank and gas holder assets with a fully comprehensive report detailing our finding sand solutions for future-proofing these assets.

Civil Construction

Enquire with us about your civil requirements. From design, construction and maintenance, our engineering department will work collaboratively with our clients to meet their specific needs.

Principal Contractor

As the Principal Contractor, we take charge of the construction phase, ensuring compliance with Health & Safety regulations to guarantee a seamless project from start to finish.

''Everyone at STORTEC is very helpful and nothing is too much of an ask.''

''I have had the pleasure of collaborating with STORTEC on multiple projects, and I must say, their swift and professional service has left me extremely satisfied. They excel at ensuring smooth and effortless project execution. Without a doubt, I look forward to working with them on future projects and I wholeheartedly endorse them as a top-notch team.''

''You've got a great team out there and are making good progress. I've had plenty of comments from visitors to say how great the tanks are looking.''

''STORTEC executed our project professionally and competently - They are our natural 'go to' supplier for equipment in the industry and field we work in.''

''I have worked with STORTEC on a number of projects in recent years, the product, site performance and approach was of the highest standard. Their commitment to the project delivery through all the challenges was unrivalled.''

Just to say thanks for the great job your lads produced for us this week, very professional, great to have them on site.

https://www.youtube.com/watch?v=Ub9QN7JOzdk

Our Products

With over 40 years of experience in the field, we know a thing or two about creating sustainable, recyclable gas storage for a variety of purposes. Head to our Products page to read how we do this, where they can be used and the benefits they bring to our clients.

Filter

ULTRASTORE®

ULTRASTORE®

Developed in-house, our sectional Stainless Steel Tank system offers multiple performance and asset life advantages over the traditional alternatives.
BIODOME®

BIODOME®

Our world-leading double membrane gas holder system designed and manufactured in the UK offers unrivalled performance and flexibility.
GLASS COATED STEEL

GLASS COATED STEEL

Bolt System Mechanical Seal Advantages Strengths

Case Studies

Filter

Kelloe STW
Kelloe STWProjects

Kelloe STW

Early engagement allowed for cultural of collaborative working to be developed leading to optimum solution to be delivered whilst keeping tight cost controls.
Read More
East Ilsley STW
East Ilsley STW_1
East Ilsley STWProjects

East Ilsley STW

The Project was delivered by STORTEC as Principal Contractor & Designer. The site is a small Sewage Treatment Works and the original Tanks have been in service since the mid 1980’s.
Read More
Minworth STW
Minworth STWProjects

Minworth STW

Minworth sewage treatment site services more than 1.7 million people in the Birmingham and Black Country area.
Read More
Luxulyan STW
Luxulyan STWProjects

Luxulyan STW

ULTRASTORE® Stainless Steel Tank Installed using our specialist Jacking Equipment.
Read More
Sway WTW (New Forest)
Sway WTW (New Forest)Projects

Sway WTW (New Forest)

Working with closely client and the end user we put several option for the replacement tank.
Read More

Case Studies

Filter

Kelloe STW
Kelloe STWProjects

Kelloe STW

Early engagement allowed for cultural of collaborative working to be developed leading to optimum solution to be delivered whilst keeping tight cost controls.
Read More
East Ilsley STW
East Ilsley STW_1
East Ilsley STWProjects

East Ilsley STW

The Project was delivered by STORTEC as Principal Contractor & Designer. The site is a small Sewage Treatment Works and the original Tanks have been in service since the mid 1980’s.
Read More
Minworth STW
Minworth STWProjects

Minworth STW

Minworth sewage treatment site services more than 1.7 million people in the Birmingham and Black Country area.
Read More
Luxulyan STW
Luxulyan STWProjects

Luxulyan STW

ULTRASTORE® Stainless Steel Tank Installed using our specialist Jacking Equipment.
Read More
Sway WTW (New Forest)
Sway WTW (New Forest)Projects

Sway WTW (New Forest)

Working with closely client and the end user we put several option for the replacement tank.
Read More