Blackburn WwTW Gas Holder

Project Overview

  • Nitrogen Purging of existing Gas Holder.
  • Temporary disconnection of the catenary wire system.
  • Removal of existing gas holder membranes and safe storage of outer membrane.
  • Installation of new inner and base membranes.
  • Reinstallation of whole gas holder system.
  • Installation of Laser.
  • Reinstallation of the catenary wire system, (checked by third party specialist).

Our Scope included:
– Dry commission of gas holder via nitrogen purging.
– Provision of welfare facilities.

Project Headlines

  • The Project was delivered by STORTEC as Principal Contractor.

  • The site is a Wastewater Treatment Works.

  • Replacement Internal Membrane and Base Membrane.

Client

United Utilities PLC

End User

United Utilities PLC

Value
  • £90,000.00
Scope

Replacement Inner & Base Membranes

Tank
  • BIODOME® Gas Holder
Diameter
  • 19,907mm
Height
  • 14,930mm
Volume
  • 3,460m³