- Nitrogen Purging of existing Gas Holder.
- Temporary disconnection of the catenary wire system.
- Removal of existing gas holder membranes and safe storage of outer membrane.
- Installation of new inner and base membranes.
- Reinstallation of whole gas holder system.
- Installation of Laser.
- Reinstallation of the catenary wire system, (checked by third party specialist).
Blackburn WwTW Gas Holder
Project Overview
Our Scope included:
– Dry commission of gas holder via nitrogen purging.
– Provision of welfare facilities.
Project Headlines
-
The Project was delivered by STORTEC as Principal Contractor.
-
The site is a Wastewater Treatment Works.
-
Replacement Internal Membrane and Base Membrane.
Client
United Utilities PLC
End User
United Utilities PLC
Value
- £90,000.00
Scope
Replacement Inner & Base Membranes
Tank
- BIODOME® Gas Holder
Diameter
- 19,907mm
Height
- 14,930mm
Volume
- 3,460m³