Wolsingham STW

Project Overview

The project consisted of the Design and Installation of water treatment package. Included in STORTEC’s scope was the excavation of site, laying out of underground pipework and installing tank bases.

All 4 Settlement Tanks were fitted with a Launder and Thickener unit (Including Bridge). All the tanks are constructed with Stainless Steel panels.

STORTEC Scrapers paired with ULTRASTORE® tanks can significantly reduce project Duration, Carbon Footprint and Interface Issues.

STORTEC’s range of scraper bridges have been engineered to meet the demand of both municipal and industrial sites, ensuring that effective design & construction methods reduce delivery times and ensure robustness in service.

Project Headlines

  • Delivered Under Budget
  • Completed 4 months ahead of Programme
  • Innovation
  • Early engagement
  • Collaborative Working
  • Muti-disciplined package
  • Bases installed with a 7.5° slope to central sump
  • Common access staircase between Humus Settlement and Primary Settlement tanks complete with peripheral walkways.
  • Sludge Tank installed open topped complete with access ladder and platform arrangement.
  • Total Package Solution
  • Full Stainless Steel solution
Client

Interserve

End User

Northumbrian Water PLC

Value
  • £700,000.00
Scope
  • Multiple Tank Package including Mechanical, Electrical and Civils

Tank
  • 2-OFF Primary Settlement Tanks
  • 2-OFF Humus Settlement Tanks
  • 1-OFF Sludge Tank
Diameter
  • 2-OFF Primary Settlement Tanks: 8,539mm
  • 2-OFF Humus Settlement Tanks: 8,539mm
  • 1-OFF Sludge Tank: 5,987mm
Height
  • 4,118mm
Volume
  • 2-OFF Primary Settlement Tanks: 207mm³
  • 2-OFF Humus Settlement Tanks: 207mm³