Cardiff

Cardiff

STORTEC delivered Tank Systems, Water Retaining Concrete Bases and Access Steelwork.
Blackburn WwTW Gas Holder

Blackburn WwTW Gas Holder

Reinstallation of whole gas holder system.
Cog Moor

Cog Moor

STORTEC design engineers are the leading experts in Sludge Cake Silo designs.
Drogheda

Drogheda

Replacement Digester Tank constructed from ULTRASTORE® Stainless Steel panels.
Basingstoke STW

Basingstoke STW

Innovative solution for the Digested Sludge Collection Tank.
Towcester WRC

Towcester WRC

Subcontracting to BIM Level 2.
Slough STW

Slough STW

The Existing Tank had reached and surpassed its asset design life and was no longer in a condition to remain in service.
Wolsingham STW

Wolsingham STW

The project consisted of the Design and Installation of water treatment package.
Kelloe STW

Kelloe STW

Early engagement allowed for cultural of collaborative working to be developed leading to optimum solution to be delivered whilst keeping tight cost controls.
East Ilsley STW_1
East Ilsley STW

East Ilsley STW

The Project was delivered by STORTEC as Principal Contractor & Designer. The site is a small Sewage Treatment Works and the original Tanks have been in service since the mid 1980’s.
Park Farm AD

Park Farm AD

Principal Contractor (CDM), Full Turnkey Package, Project delivered under budget, Completed within extremely expedited programme.
Minworth STW

Minworth STW

Minworth sewage treatment site services more than 1.7 million people in the Birmingham and Black Country area.
Luxulyan STW

Luxulyan STW

ULTRASTORE® Stainless Steel Tank Installed using our specialist Jacking Equipment.
Sway WTW (New Forest)

Sway WTW (New Forest)

Working with closely client and the end user we put several option for the replacement tank.