Early engagement allowed for cultural of collaborative working to be developed leading to optimum solution to be delivered whilst keeping tight cost controls.
The Project was delivered by STORTEC as Principal Contractor & Designer. The site is a small Sewage Treatment Works and the original Tanks have been in service since the mid 1980’s.